Skip to content

FLOOR PLANS

Specification
Dinning & Passage
floor – Vitrified floor Tile
Walls & Ceiling – Plastered surface with plastic Emulsion paint

Drawing Room
floor – Vitrified floor Tile
Walls & Ceiling – Plastered surface with plastic Emulsion paint

Bedrooms
floor- Vitrified floor Tile
Walls & Ceiling- Plastered surface with plastic Emulsion paint
Toilet- Branded single lever CP fittings, standard sanitary ware and ceramic tiles

Kitchen
floor – Vitrified floor Tile
Walls & Ceiling – Plastered surface with plastic Emulsion paint
Toilet- Granite counter top

Balconies
floor – anti skid ceramic tiles
Ceiling – As per exterior

Doors & Windows
Interiors – Designer Flush/Modular wooden doors with painted finish & SS finish
External – Accessories on wooden frames inside the apartments Wooden windows

Security
State-of-the-art – 24*7 Security. CCTV surveillance in the entire Complex Boom barriers for controlled vehicular access
Entry & Exit Gates-

Fire Protection
Fire safety – As per National Building Code

Facilities
Club, Swimming pool, gymnasium, kids play Size, indoor & outdoor games, multi-purpose hall & cafeteria

Lifts
Modern high-speed elevators Intercom & camera connected to the security room

Others
100% power back-up, wi-fi enabled complex, ample parking


Floor Plan and Costing
Tentative Flat Cost for Members(in INR)

Category of flat*

Super Area*
(Tentative in sq.ft.)

Land Cost#
(in INR)

Construction Cost**
(in INR)

Tentative Cost of Flat
(in INR)

2BHK 1900 1200000 2600000 3800000
3BHK 2100 1400000 3040000 4440000
4BHK 2500 1600000 3380000 5180000

Built up Area- 2BHK: 1200 sq.ft.,3BHK: 1400 sq.ft.,4 BHK: 1600 sq.ft.

*Inclusions: Thickness of walls, balconies, terrace, lift area, shaft, common passage and stair case area, area under parking.

*Exclusions:Community hall, club house, swimming pool, and other facility and utilities.

Note: However final layout shall be prepared at the time of submission of the layout plan and may vary due to changes in the regulation.

  • **Final construction cost shall be arrived at depending on the final layout plan as decided in the AGM, input cost of materials, level of amenities to be included, and any other justifiable factor that may come into force at the time of construction.
  • *Category of flats shall be decided after receiving the sufficient number of booking of flats in specific type.
  • # Land share money to be paid with the application of membership.
  • The above details are being calculated in accordance to the last Gazette Notification No 2076, 6th Sep.2013.
  • On any ratification on the Government Polices, the society will abide by the same and any changes(+/-) in the Size/price, the member shall agree to abide by the same. Taxes if any, will be paid by the individual member as applicable.
  • External/Internal development charges to be paid in actual with the progress of the construction if applicable.
  • The construction cost is purely indicative estimate. The actual cost of construction shall be decided prior to the commencement of the activity and shall depend on the size of the project, modifications in building design, modifications in the floor plan, specifications adopted, height of structure, infrastructure installations etc.
  • Any increase/decrease in the construction cost shall be to the members account and shall be in the line with market scenario.
  • All the floor plans, Size, specification and dimensions are indicative and are subjected to change as decided by competent authorities